Original method
Tetsu Kasuya 4:6 Method.
Review the parameters and pour schedule, or start the guided timer.
Recipe setup
Coffee
20g
Water
300g
Ratio
1:15
Temperature
92°C
Grind
coarse
Target
3:30
Pour schedule
Bloom — first 40%
Pour to 50g. Let bloom until 0:45.
Scale target · 50gSecond 40% pour
Add 70g to reach 120g total, then let the bed drain until 1:30.
Scale target · 120gFirst 60% pour
Add 60g to reach 180g total, then let the bed drain until 2:15.
Scale target · 180gSecond 60% pour
Add 60g to reach 240g total, then let the bed drain until 3:00.
Scale target · 240gFinal 60% pour
Add the final 60g to reach 300g total.
Scale target · 300gLift dripper
At 3:30, lift the dripper from the server.